Home

  • Schedules & Fares
    • Full Schedule
    • Weekday Schedule
    • Weekend Schedule
    • Fares
    • Specials & Promotions
    • Everyday Discounts
  • Reservations & Tickets
  • Stations
    • Brunswick
    • Freeport
    • Portland
    • Old Orchard Beach
    • Saco
    • Wells
    • Dover
    • Durham - UNH
    • Exeter
    • Haverhill
    • Woburn
    • Boston
  • Multi Ride Passes
  • Group Travel
  • On Board
    • Coach Class
    • Business Class
    • Café Car
    • Bicycles
    • Wireless Internet
    • Accessibility
    • Meet the Crew
  • Store
PRINT
-A A +A

Deep Cut Photo Gallery

Freight train passes through Deep Cut after the completion of drainage and track panel reinstallation.
Special Project Manager, Jim Russell, discusses drainage with MaineDOT.
The purpose of this portion of the project is to install underground drainage along approximately 2,000 feet of railroad right of way so that water drains away from the track.
Pan Am Crews prepare for the project by panelizing and removing track along the areas being worked on each week.
The Right of Way is then “flooded” with ballast to allow access of excavation equipment.
K&K Excavation assembles equipment to enter the work area.
Equipment enters the site
K&K installs under drainage and underground pipes.
Brunswick Expansion, Deep Cut
K&K Excavation
Brunswick Expansion, Deep Cut
Excavators secure existing drainpipes.
Underground drainage systems are being installed along approximately 2,000 feet of right of way.

View NNEPRA Project Photo Galleries >>

Fare Finder

One Way  Round-Trip 
Multi-City Trip »
Departs:
Departure Date:
Time:
Arrives:
Return Date: (optional)
Time: (optional)
Passengers: (Max. of 8)
Adults
Children Infants

Project Reports

No reports available for this project at this time.

© 2013 NNEPRA | All Rights Reserved
  • Contact Us
  • About Us
  • Reports & Statistics
  • Rail News
  • Privacy Policy
  • Amtrak.com
  • NNEPRA Projects